亚洲成a人片77777群色,熟妇的味道HD中文字幕,久久国产vs

Shandong Water Conservancy Construction Group Co.,Ltd
Chinese
English
Contact Us  
Tel:+86 0537-2270579
Fax:+86 0537-2270579
E-mail:[email protected]
News
 

Strong dredged ships in Bangladesh prepared for facing Farney typhoon and survived in safety

                                                                                             2019-05-13


Once in 20 years, the strongest typhoon cyclone "Farney" sweeping over India and Bangladesh landed in Kurna and its surrounding areas along the coast of Bangladesh on the evening of May 3. The maximum wind power in the center is up to 200 kilometers per hour and the maximum wind power is 16 classes. On the 4th, the typhoon goes through the area where our ship is located, the dredging project department prepared the protection measures against typhoons in accordance with meteorological information.
On May 1st, the project department entered the state of typhoon weather readiness in the shortest time, immediately suspended 1600 fleet and guide No. 2 fleet to evacuate the construction site and take refuge in the harbor. During this period, the project department mobilized all the people present to understand the typhoon process and enhance risk awareness to cope with the test together.

On the eve of the typhoon, the person in charge of site fully analyzed the situation of the typhoon. In view of the characteristics of the typhoon, such as fast moving speed, strong central wind and wide influence, he led the team to brainstorm and make reasonable measures for typhoon prevention. Adjust the anchorage position of each ship, strengthen the communication and communication between each ship, keep abreast of the status of each ship at any time; tighten the binding of all locks and life-saving equipment on the ship to ensure that all cabin doors and windows are strictly closed; arrange the presence of personnel and local workers to watch real-time satellite cloud maps at night and do a good job of early warning.
After 72 hours, the dredging project department of Bangladesh survived the typhoon with zero loss. Faced with the first typhoon of overseas dredging experience, the project department and the whole team worked together to ensure personal and property safety. This defense work has also accumulated valuable practical experience for the future.






Link

Copyright  Shandong Water Conservancy Construction Group Co.,Ltd
Add:No. Ten East Road, 33399 Shuifa tower, Ji'nan (The intersection of ten East Road and Tang Ye Xi Road)    Tel:+86 0531 80876106    E-mail:[email protected]
  • <menuitem id="jkwct"><b id="jkwct"><tr id="jkwct"></tr></b></menuitem>
  • 主站蜘蛛池模板: 平昌县| 仁布县| 奎屯市| 修武县| 克拉玛依市| 绥芬河市| 托里县| 长春市| 商河县| 高邮市| 塘沽区| 蒲城县| 兴宁市| 威远县| 肃北| 安岳县| 梨树县| 和林格尔县| 昌邑市| 图木舒克市| 定陶县| 门源| 张掖市| 昭苏县| 荔波县| 灌阳县| 东至县| 罗甸县| 苗栗县| 上林县| 绥阳县| 图们市| 丰城市| 六安市| 青冈县| 扶沟县| 全州县| 永靖县| 关岭| 准格尔旗| 比如县|